Recharge Shaft:

Recharge Shaft:

It is performed in a river basin where water percolation is poor, mostly in black cotton soil. A 100 feet bore-well is drilled, and a trench of 2.5*2*2 meters is created and filled with stones, pebbles, and sand to increase recharge.